+1 954 541 9464 info@bosscgc.com Mon - Fri 09:00 AM - 6:00 PM 5785 S University Dr Suite 101, Davie, FL 33328

Blog 3 Columns

What is a “Pre-loss condition”?

“Pre-loss condition” is a term used by insurance companies to describe the condition of a residence or vehicle prior to damage. It is the act of restoring the vehicle or residence to...
Continue Reading

What are As Built Drawings?

As Builts drawings are documents that allow a compare and contrast between the designed versus final specifications, and provide a detailed blueprint of the building and the land around it...
Continue Reading

What is a Municipal Lien?

A municipal lien is a lien filed by a municipal corporation against a property owner for the owner’s proportional share of public improvement that specifically and individually benefits the owner. In Florida, a Municipal Lien Search...
Continue Reading

What is Soil Compaction?

In geotechnical engineering, soil compaction is the process in which stress is applied to a soil causes densification as air is displaced from the pores between the soil grains. Here...
Continue Reading